arrow arrow

TDS geo R-040 Insulating roll

The insulating rolls (stone wool) are used at:

  • Inner walls
  • Dry constructions
  • Roofs
Density: p=40kg/m³
Thickness: 50-60-80-100mm
Roll dimensions: 1m*6m
Fire resistance: A1
Temperature resistance: :1000°C
Thermal conductivity: Λ=0.034 W/m*K
close me

Insulating from the inside of the walls

One of the most common methods of thermal insulation

close me

Sandwich wall insulation

One of the most common methods of thermal insulation

close me

Outside thermal facade

close me

How to apply TERMOPOR-F?

  • image

    1.The surface (brick, concrete etc.) at which the TERMOPOR-F is applied, have to be cleaned off any dust or bumps.

  • image

    2.At the bottom of the wall the cornering outline is applied whose dimensions depend on the thickness of the TERMOPOR-F panels, for example, if you use panels with 50mm thickness than the cornering outline has to be with 53mm thickness.

  • image

    3.The cornering outline on the wall is strengthened with standard screws and wall-rivets. Eventually as a replacement of the cornering outlines can be used a wood lath whose thickness is compatible with the thickness of the TERMOPOR-F panels, that are used for the thermal insulation.

  • image

    4.Along the strengthened cornering lath on the wall the rabitz net is glued, whose bottom end after the application of the first panel is flipped over it. For the net application, special glue for polystyrene is used.

  • image

    5.TERMOPOR-F 20kg/m³ panels are glued on the wall in that way the glue is equally spread on every corner of the panel and on several other places on the panel.

  • image

    6.Every new row begins at the middle of the previous panel.

  • image

    7.After the application of all the TERMOPOR-F panels is complete, the next step is the application of cornering PVC outlines on all the openings of the facade (doors, windows etc.)

  • image

    8.On the glued TERMOPOR-F panels a layer of glue is applied and in it the rabitz net is pressed (5*5mm). The net is applied in that way that there is overlapping.

  • image

    9.By adding just a little more glue you move on to the final refining of the surface, and after 24 hours, with a roller, all over the surface, a layer of the founding matter is applied.

  • image

    10.Few hours after the application of the founding matter is applied has been done, you can start with the application of the top layer of the facade, for which we use a smoothing tool.

close me

Thermal insulation of the floor

  • image

    1.surface must be clean and smooth

  • image

    2.the surface need to be cover with prajmer - a cold liquid (when there is a need for hydro insulation)

  • image

    3.hydro insulation is placed (when there is a need for hydro insulation)

  • image

    4.diletaciona bar is placed

  • image

    5.Termopor® panels are placed with 30kg/m³ density (for perfect condition 2 layers are needed)

  • image

    6.PE foil is placed for cover

  • image

    7.concrete layer is being placed (it is advisable to use thin wire network)