arrow arrow

Termofasada

ТЕРМОПОР thermal facade is a thermal insulating system for an outside covering of the buildings. The main goal of TERMOPOR thermal facade is to enable a comfortable ambience for living inside the buildings for less money. That means that the costs for heating in winter and cooling in summer are kept at minimum.

The elements of which the TERMOPOR thermal facade is made are:

  • TERMOPOR EPS panels
    • recommended 20kg/m3; min. 70mm thickness
  • MARMODOM FL 100 glue for TERMOPOR
  • Rabitz net
    • recommended 145gr/m2
  • Tipli
  • starting bar (cokl bus)
  • angle bar
  • MARMODOM FL 100 ST second finishing layer
  • Abrip, or a facade by a choice of the investor

TERMOPOR thermal facade can be applied almost on any surface including:

  • Brick
  • Full brick
  • Concrete block
  • Concrete
  • Wood
  • OSB

Procedure of application:

  • Firstly you clean the surface on the wall on which the TERMOPOR panels are supposed to be glued on (it is meant on mechanical cleaning)
  • Before applying the first TERMOPOR panel it is necessary that on the bottom of the wall you level it with the starting bar, cokl bus
  • On the TERMOPOR panels the MARMODOM FL 100 glue is applied; on each corner of the panel, and two scoops on the middle of the panel.
  • The TERMOPOR panels are glued onto the wall horizontally length-wise. (second row starts at the middle of the first one and so on)
  • After the panel arrangement has been finished, the second layer of MARMODOM FL 100 ST glue is applied, and this layer of glue is always applied before the RABITZ NETTING.
  • The RABITZ netting is than applied vertically and is pressed into the second layer of MARMODOM FL 100 ST glue
  • The TIPLI are applied
  • The final layer depends on the investors choice, the type of facade that has been selected.
close me

Insulating from the inside of the walls

One of the most common methods of thermal insulation

close me

Sandwich wall insulation

One of the most common methods of thermal insulation

close me

Outside thermal facade

close me

How to apply TERMOPOR-F?

  • image

    1.The surface (brick, concrete etc.) at which the TERMOPOR-F is applied, have to be cleaned off any dust or bumps.

  • image

    2.At the bottom of the wall the cornering outline is applied whose dimensions depend on the thickness of the TERMOPOR-F panels, for example, if you use panels with 50mm thickness than the cornering outline has to be with 53mm thickness.

  • image

    3.The cornering outline on the wall is strengthened with standard screws and wall-rivets. Eventually as a replacement of the cornering outlines can be used a wood lath whose thickness is compatible with the thickness of the TERMOPOR-F panels, that are used for the thermal insulation.

  • image

    4.Along the strengthened cornering lath on the wall the rabitz net is glued, whose bottom end after the application of the first panel is flipped over it. For the net application, special glue for polystyrene is used.

  • image

    5.TERMOPOR-F 20kg/m³ panels are glued on the wall in that way the glue is equally spread on every corner of the panel and on several other places on the panel.

  • image

    6.Every new row begins at the middle of the previous panel.

  • image

    7.After the application of all the TERMOPOR-F panels is complete, the next step is the application of cornering PVC outlines on all the openings of the facade (doors, windows etc.)

  • image

    8.On the glued TERMOPOR-F panels a layer of glue is applied and in it the rabitz net is pressed (5*5mm). The net is applied in that way that there is overlapping.

  • image

    9.By adding just a little more glue you move on to the final refining of the surface, and after 24 hours, with a roller, all over the surface, a layer of the founding matter is applied.

  • image

    10.Few hours after the application of the founding matter is applied has been done, you can start with the application of the top layer of the facade, for which we use a smoothing tool.

close me

Thermal insulation of the floor

  • image

    1.surface must be clean and smooth

  • image

    2.the surface need to be cover with prajmer - a cold liquid (when there is a need for hydro insulation)

  • image

    3.hydro insulation is placed (when there is a need for hydro insulation)

  • image

    4.diletaciona bar is placed

  • image

    5.Termopor® panels are placed with 30kg/m³ density (for perfect condition 2 layers are needed)

  • image

    6.PE foil is placed for cover

  • image

    7.concrete layer is being placed (it is advisable to use thin wire network)